项城词语网>英语词典>overburden翻译和用法

overburden

英 [ˌəʊvəˈbɜːdn]

美 [ˌoʊvərˈbɜːrdn]

v.  使负担过重

过去分词:overburdened 过去式:overburdened 现在分词:overburdening 第三人称单数:overburdens 

TOEFL经济

BNC.20075 / COCA.20715

牛津词典

    verb

    • 使负担过重
      to give sb/sth more work, worry, etc. than they can deal with

      英英释义

      noun

      • an excessive burden
          Synonym:overload
        1. the surface soil that must be moved away to get at coal seams and mineral deposits

          verb

          • burden with too much work or responsibility
            1. load with excessive weight

              双语例句

              • Study on Debris Flow Forming Reasons in Overburden Layer During Transition Mining from Open Pit Mine to Underground Mine The oil workers drilled down another 10 feet to find oil.
                露天转地下开采覆盖层形成泥石流原因的研究在地下打洞石油工人为了开采石油又往下钻了10英尺。
              • This paper introduces the successful freezing technology and construction experience of Dingji air shaft sinking in thick overburden.
                介绍丁集风井深厚表土层的冻结技术及施工的成功经验。
              • The process of ore-drawing in block caving is completed under overburden.
                自然崩落法放矿基本上都是在覆盖岩层下进行的。
              • Study on Mine Earthquake Induced by Falling of Overburden Strata over Goaf and Its Predictive Technology
                采空区上覆岩层诱发矿震及预测技术研究
              • Study on Underground Cutting Technique with Shallow Overburden and Environmental Effect of City Underpass
                城市人行地道浅埋暗挖施工技术及其环境效应研究
              • Stability analysis of loose surrounding rock with shallow overburden by a discretization finite element method
                一种浅埋松散围岩稳定性离散化有限元分析方法探讨
              • Ecologists point out that a cluster of high-rise buildings in a city often overburden public transportation and parking-lot capacities.
                生态学家指出,城市里的高层建筑群使公共交通和停车容量负担过重。
              • Research on influence of overburden primary key stratum movement on surface subsidence with in-situ drilling test
                覆岩主关键层运动对地表沉陷影响的钻孔原位测试研究
              • Study of Overburden Water Flowing Fractured Zone Height of Steep Seam Mining
                急倾斜煤层覆岩导水裂隙带高度研究
              • The method of culvert-undercutting with shallow overburden is adopted to construct Beijing Xisihuan underground culvert of South-to-north Transfer Project.
                南水北调北京西四环暗涵施工中采用了浅埋暗涵施工法。